GREENSWARD
COLLEGE, GREENSWARD LANE, HOCKLEY.
NEW CAFETERIA & KITCHEN BUILDING.
|
|
|
 |
BRIEF – To
provide a new “all day” café type
catering facility in an independent building on the
school grounds. |
 |
DATE
COMPLETED – 12th November 2004 |
 |
GROSS
FLOOR AREA – 440 m² |
 |
BUILD
COST - £590k |
 |
DETAILS – The
new building was required to be of minimum height in
relation to adjacent residential properties. This was
achieved with a split, low pitch roof design incorporating
high level clerestory glazing to bring daylight into
the deep plan. In order to keep tight control of cost
and build time, the contract was completed successfully
by design and build procurement method.
|
|
|
|